Family Housing Replacement is a design/build fast track project located in the Denali Village area on Fort Wainwright, AK. Extensive site work has been required to deal with permafrost and unsuitable soil issues to make the site suitable for a subdivision consisting of 200 Units of Junior and Senior Non-Commissioned Officer Housing with all associated infrastructure. Five different housing types in 4-plex configurations are situated on curvilinear streets with direct buried water, sewer, electrical and glycol circulation systems.

Project Name: Family Housing Replacement,
Denali Village
Location: Fort Wainwright, Ak.
Start Date: May 2007
End Date: September 2009
General Contractor: Neeser Construction
Project Cost: $118 million


Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.