The project includes 750,000 sq-ft tenant improvements consisting of offices, conference rooms, espresso bars, elevator lobbies, main reception, locker rooms, bathrooms, multi-purpose rooms, server lab, two cafeterias and three kitchens.
Project Name: Bravern I and II
Location: Bellevue, WA
Total Construction Cost: $116 million
Construction Start Date: May 08
Expected Completion Date: July 08
Owner/Developer: International Software Developer
General Contractor: Howard S. Wright Constructors
Design Firm (Architect or
Lead Engineer): Collins Woerman
Engineers or Other
Design Consultants: Coffman Engineers (Electrical),
Holaday-Parks (Mechanical),
DCI (Structural)


Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.