homepage home
subscribe to Northwest Construction magazine subscribe
newsletters free e-newsletter
advertise
industry jobs industry jobs
Mcgraw-Hill Construction Logo
Northwest Construction Logo
Order Your RISK FREE Subscription
comment

Open Bell Soon to Ring at Issaquah High

Massive Replacement School Progresses Next to Existing School

Text size: A A
[ Page 2 of 2 ]

The closed-circulation campus serves multiple purposes, including tightening security on a currently porous space and creating a redundancy of circulation, keeping students inside in difficult weather and allowing exterior routes when sunshine allows it.

----- Advertising -----

Where the loading dock excites people most on campus now because it features the lone view of the valley, those views will spread throughout the new space. By creating worthwhile view-oriented public spaces, such as the courtyard, Kent also connected the campus socially. With academics on one side, athletics and extracurricular on the other, the common areas bring the two together.

“The courtyard really became important,” Kent says. “It is an outdoor space, but directly ties to the indoor social space—the cafeteria and the commons—with a wide area. It is the social gathering node of the school and ends up being one of the most pleasant spaces because it is light, airy and open, and you can see down the valley and the football field.”

Key Players

Owner: Issaquah School District

Architect: Mahlum Architects

General Contractor: Cornerstone General Contracting

Engineers: Coughlin Porter Lundeen; Coffman Engineers; Flack & Kurtz

Consultants: Cascade Design Collaborative; PLA Designs; Listen Acoustics

Subcontractors: Jack Horner Electric; Robison Plumbing & Mechanical

Once students move into the new rooms, work intensifies on phase two, a performing arts center complete with industrial arts, band, choir and a black-box theater. Completion of phase two is set for summer 2011.

“Essentially, it’s an addition to the school we just finished,” Gromley says. “The reason for doing the phasing was it allowed the district to build the school while students were attending class on the same campus.”

The third phase puts finishing touches on the project, especially on the landscape.

“I think staff and kids find it to be an exciting space,” Crawford says. “There is a good connection to the outdoors. They will be indoors more but actually feel much more a part of the adjacent outdoor environment.”

 

[ Page 2 of 2 ]
----- Advertising -----
Dodge Reports

Below is a brief listing of Projects Bidding in the Alaska, Oregon and Washington. Click on any project to get Dodge Report, Plans and Specifications.

Click Here to See More Projects in the Alaska, Oregon and Washington

Blog: Evergreen
Tim Newcomb is a newspaper and magazine journalist based in Western Washington, covering design and construction in buildings and transportation around the Northwest.
Reader Photos
Photos from Northwest Construction Photo Showcase
----- Advertising -----
 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.